Stockholm Waterfront

When Stockholm Waterfront near the central station was finished in 2010, the city had a new congress hall with capacity for 3,000 delegates, suitable for both local and international events.

Client
  • Fastighets AB Bangården/Peab

The facility also includes a hotel and an office building.

Assemblin was commissioned to carry out installations for water, sanitation, comfort cooling and heating in the congress part. The project was conducted as a general contract. The end client was Peab and the main contractor was Fastighets AB Bangården.